Track record

Filter results

Stek successfully represented Budget Energie in dispute regarding the reduction of feed-in compensation

Stek successfully represented Budget Energie, part of Budget Thuis, in a key case against a consumer concerning the reduction of the feed-in compensation for electricity from 100% to 50% of the base supply rate per kWh. The case was brought by a consumer who argued that the reduction was in…

Stek advises ASN on the project financing for a 31.6 MW battery for FlevoBESS

Stek advised ASN on the project financing for a 31.6 MW battery with a 4 hour storage capacity (126 MWh) for FlevoBESS. The battery is part of a larger energy storage project realised in cooperation with GreenPowerBank Dronten B.V. and Pure Energie Groen B.V. The battery to be built with…

Stek advises Dispatch on the introduction of the largest stand-alone battery storage system in the Netherlands

Dispatch, a Dutch battery developer, is to build the largest stand-alone battery storage system (BESS) in the Netherlands, in which Stek acted as its advisor. The battery with a capacity of 45 MW/90 MWh will be built in the port area of Dordrecht on a 6,000 m²…

Stek advises on Open Heat Grid Delft

The municipality of Delft is advancing towards providing affordable and sustainable heating to its residents with the establishment of a new district heating network in the Voorhof and Buitenhof neighborhoods. Recently, key stakeholders, including housing corporations Woonbron, Vidomes, Stedelink, and DUWO, along with heating network operator NetVerder, heat supplier InWarmte,…