Stek advised ASN on the project financing for a 31.6 MW battery with a 4 hour storage capacity (126 MWh) for FlevoBESS. The battery is part of a larger energy storage project realised in cooperation with GreenPowerBank Dronten B.V. and Pure Energie Groen B.V. The battery to be built with the financing will be one of the biggest batteries in the Netherlands at the time of construction.

Read more about the project here: https://dronterenergieopslag.nl/ and https://flevo-bess.nl