Track record

Filter results

Stek advises GlasDraad on the projectfinancing for the construction of the fiber network

Stek advised GlasDraad on the €110 million financing provided by ABN AMRO Bank N.V. en Belfius Bank NV/SA to be applied in the construction of the fiber network in (parts of) the Netherlands.

Stek advises BNG Bank on the project financing provided to solar project Noordermeerdijk

Stek has advised BNG Bank on the financing of the Noordermeerdijk solar farm owned by HVC and the local landowners. The solar project will have approximately 161,000 solarpanels with a capacity of 98 MWp. That is enough to provide 37,500 households with green electricity each year. The solar panels…

Stek advises Rabobank on the financing of two solarparks for Attero

Stek has advised Rabobank on the non-recourse green project financing to finance construction and operational phase of two solar parks be constructed on Attero’s closed off landfills (Inert Mineral Depositories, or ‘IMD’s’) in Wijster (32.1 MWp) and Montfort (16.0 MWp).

Stek advised on the projectfinancing for the construction of two large 20MW biomethane plants in the Netherlands

Stek advised senior lenders ABN AMRO Bank and ING Bank on the €120 million financing for SFP Group to be applied in the construction of two large 20MW biomethane plants in the Netherlands. SFP Group will now have capacity to produce ~800 GWh of biomethane annually, enough to supply…

Stek successful in appeal on network congestion rules

Stek has successfully represented the electricity distribution system operators, through their representative organization Netbeheer Nederland, in an appeal initiated by Energie-Nederland before the Administrative High Court for Trade and Industry (“CBb”) against a decision of the Dutch energy regulator, the Authority for Consumers and Markets (“ACM”), on congestion management.

Stek advises Dispatch on the introduction of the largest stand-alone battery storage system in the Netherlands

Dispatch, a Dutch battery developer, is to build the largest stand-alone battery storage system (BESS) in the Netherlands, in which Stek acted as its advisor. The battery with a capacity of 45 MW/90 MWh will be built in the port area of Dordrecht on a…

Stek successfully fends off civil claim of Nobian for Stedin

Stek has successfully represented energy distribution system operator Stedin Netbeheer B.V. (“Stedin”) in fending off a civil claim of Nobian Industrial Chemicals B.V. (“Nobian”). Before the Rotterdam District Court Nobian claimed that the court should order Stedin with transmission system operator TenneT TSO B.V. jointly and severally liable…

Stek advises on Open Heat Grid Delft

The municipality of Delft is advancing towards providing affordable and sustainable heating to its residents with the establishment of a new district heating network in the Voorhof and Buitenhof neighborhoods. Recently, key stakeholders, including housing corporations Woonbron, Vidomes, Stedelink, and DUWO, along with heating network operator NetVerder, heat supplier InWarmte,…

Stek advises Stedin on equity issue to 23 provinces and municipalities as new shareholders

Stek has advised grid operator Stedin Group on an equity issue of € 34,8 million to 23 new shareholders being two provinces and 21 municipalities. The investment further strengthens Stedin’s equity position and evidences the engagement of the public shareholders within the geographic service area of Stedin. This concludes Stedin’s…