Stek victorious for distribution operator Liander in summary proceedings regarding grid congestion

Stek successfully represented Dutch distribution system operator Liander in summary proceedings before the Midden-Nederland District Court against one of its customers. The customer, a houseplant grower, was causing disruptions to the electricity grid by exceeding the agreed-upon transmission capacity. After Liander announced the occurrence of grid congestion, the customer’s consultant…

Stek victorious for distribution system operator Liander in appeal regarding grid congestion

Stek successfully represented grid operator Liander in the appeal filed by Jumbo Supermarkets (“Jumbo”) with the Arnhem-Leeuwarden Court of Appeal (the “Court of Appeal”) against two preliminary injunction rulings issued by the court in summary proceedings of the Gelderland District Court on 20 September 2023 and…

Stek again victorious for USG on allocation of costs for the transportation of electricity to SABIC

Stek has successfully represented Utility Support Group (USG) B.V. (“USG”) in the continuation of its dispute with SABIC Petrochemicals B.V. (“SABIC”) over the allocation of costs for the transport of electricity via the closed distribution system of USG on the so-called Chemelot site (the “CDS”). Stek had already successfully represented…

Stek victorious for distribution system operator Liander in transmission capacity dispute

Stek successfully represented distribution system operator Liander in summary proceedings before the Gelderland District Court against one of its customers. The customer, a strawberry grower, was causing problems on the electricity grid by using too much transmission capacity. Liander successfully claimed that the customer should limit itself to the contracted…

Stek victorious for Liander in dispute about qualification electricity connection

Stek has successfully represented distribution system operator Liander in proceedings before the District Court of Gelderland (the District Court) concerning the qualification of an old, previously replaced connection to the electricity grid. The proceedings were initiated by printing company Senefelder Misset (Senefelder), who argued that its original connection had a…

Stek victorious for Eneco in annulment procedure binding decision Energy Disputes Committee on the allocation of heating costs

Stek has successfully represented Eneco in a procedure to annul a binding decision issued by the Energy Disputes Committee regarding the allocation of heating costs in an apartment complex connected to Eneco’s district heating network. The District Court ruled that Eneco’s methodology is in accordance with (the purpose of) the…

Stek victorious for Eneco in appeal against Advertising Code Committee decision on sustainability claim

Stek has successfully represented energy supplier Eneco in an appeal procedure before the Board of Appeal (BoA) against a decision of the Advertising Code Committee (ACC). In contrast to the ACC, the BoA ruled that Eneco is allowed to advertise the electricity it supplies generated by Dutch wind and solar…

Stek victorious for USG

Stek has successfully represented Utility Support Group in the objections procedure of Sabic Petrochemicals against the decline of Sabic’s enforcement request by the Authority for Consumers and Markets, the energy regulator. Sabic argued that USG incorrectly applied the so-called volume correction in its electricity transport rates. By decision of 3…